Got the engine bay stripped down and ready to start the left frame rail extension repairs.
To straighten the mangled mess, I had to cut off the frame extension
just ahead of the suspension cross member mounting location.
After sandblasting and during straightening it became clear that the
metal was full of cracks and bad welds. I decided to cut all the bad
metal out and weld in a new fabricated section.
No comments:
Post a Comment