I drilled the new floor panel in preparation for welding. These holes will get filled using a 'plug welding' technique that gives similar results to the factory spot welding, so I used the same number and spacing as the original spot welds. For the record, it needed 162 holes.
Subscribe to:
Post Comments (Atom)
-
Cleaned away the rust from the rocker with a wire wheel, and it revealed some rust through. So this would be cut out and patched. Inner ...
-
Repair work to the right-hand side dogleg was virtually the same as the left-hand side. Inside rocker looked much the same as the other si...
-
Before fitting the new replacement panel, the attachment surfaces on the wing need to be cleaned up and prepared for welding. But there ...